Client: Teck Coal Limited
Diversion of Dry Creek for mitigation of selenium impact via an engineered diversion structure, intake structure, HDPE transfer pipeline and two settling ponds. A flocculant is used to assist with settling the selenium as the creek water moves through the sediments ponds.